Ethiopia Ropeway

BHUTAN

Design & Engineering, Supply, Testing & Supervision of erection installation of Ropeway over Barsa River was undertaken for the Bhutan Carbide & Chemicals Limited, Bhutan. It was a challenging project as a river needed to be crossed, however the same was done with immaculate planning and execution by our experienced engineers.

SYSTEM                                      Single Jigback

Speed                                          0.5 m/s

Material size                              25 mm

Speed                                          4m / Sec. nominal

Pay load                                      200 Kg [Maximum]

No. Of Buckets                          1

Gallery
Buy Ticket Online