Design & Engineering, Supply, Testing & Supervision of erection installation of Ropeway over Barsa River was undertaken for the Bhutan Carbide & Chemicals Limited, Bhutan. It was a challenging project as a river needed to be crossed, however the same was done with immaculate planning and execution by our experienced engineers.
SYSTEM Single Jigback
Speed 0.5 m/s
Material size 25 mm
Speed 4m / Sec. nominal
Pay load 200 Kg [Maximum]
No. Of Buckets 1